From the Jaws of Defeat: Tips and Solutions for Project Revival

Online Events Archive

Online Forums 2014 - April 11, 2014
Powered by Adobe Connect

Dave Goodman

Director
SoftAssist

Recent research from the Standish Group stated that a staggering 31.1% of projects will be cancelled before they ever get completed. Another startling statistic: 52.7% of projects will cost an average 189% of their original estimates. In a perfect world, we would complete projects on time and on budget. Clients would always be pleased with our end product, budgets would never be an issue, there would be no project-manager or subject-matter-expert turnover, and the words “out of scope” would never be uttered. Unfortunately, we don’t live in a perfect world. In the real world, all of these issues exist and often result in project failure.

Through real-world examples, participants in this session will explore the reasons projects fail—including scope changes, turnover, multiple reviews and reviewers, poorly written requirements documents, and communication issues—and gain tips and solutions for keeping your projects viable and on track.

In this session, you will learn:

  • The top five reasons projects fail
  • Tips and solutions for salvaging projects that are “in trouble”
  • How to set policies and procedures to limit project problems in the first place

Audience:
Project managers and managers who have some experience with project failure.

Handout(s)

You do not have access to the handouts. Please log in or join to download these files.

Recording

You do not have access to the recording. Please log in or join to download this file.

 

 Back to Library
Advertise Here
Advertise Here

Upcoming Events

Guild Platinum Sponsors

Guild Sponsors

We Proudly Support

Humentum

Recent Job Postings